Sunday, June 27, 2010

Organization

So we have had this shed that we purchased at Sams Club sitting in our garage for well over 6 weeks taking up lots of space. (The boxes were huge!) We finally decided we were at a point that we could get it put together.

Oh my h#*%!!!! Can I just say. I don't ever want to do that again.

When we went to start, (10:30 a.m.) Kelly decided to change the base that it was going to sit on from a gravel base, to a ply wood base. (3 hours later) We were actually ready to start building the shed.
After getting about 4 of the walls up we found out that we didn't do as good of a job at getting a flat base as we thought we did. Thus the beginning of a really really really long project.

After we hit a point in the directions it said that this step requires three adults.
Great! Now what?
Kelly called his brother Brock, thankfully he was able to drive over from Henefer to help us out.
Brock left at about 11:00 p.m.
After making sure that Zach was asleep I went back out to help again with the finishing touches and loading some of the stuff inside.
Let's just say that after jumping in the shower to wash away the grime of all that work, and finding a snack to eat, I was STARVING! I went to bed at about 2:15 a.m.
What a really LONG day!
So here is a couple of pictures of the whole process.
And this is what the garage looked like after we finished.










No comments: